Uslu Demir Çelik
With the Osmaniye Steel Service Center investment, we will raise the quality to very high levels. The facility, which will come into operation at the beginning of 2022, will be built on 50,000 m2 with a closed area of 25,000 m2. The machine park, which includes 3 cut-to-length lines with the thickness from 0.50 mm to 25.00 mm, 2 slitting lines with the thickness from 0.30 mm to 10.00 mm, trapeze line, sandblasting painting line and plasma cutting machine, meets the needs of the market at the highest level.